Safety Tips For LNG Refueling Stations

1. LNG has an extremely low temperature at ambient atmospheric pressure: -162℃;
2. It has a large gas-liquid volume ratio, and if decompression measures are not properly implemented, the pressure will rise rapidly. 1. The gas-liquid volume ratio of LNG is approximately 620:1;

2. Small initial refueling volume leads to a higher gas loss rate due to natural vaporization;

3. LNG vehicles in urban areas inevitably experience gas release issues;

4. Natural gas is flammable; production areas must have clear safety signs;

5. Skid-mounted LNG vehicle refueling stations should be used in areas with complete safety measures and fixed locations. Unauthorized movement is strictly prohibited, and vacuum process pipelines must not be stepped on;

6. Collisions with storage tanks are strictly prohibited during transportation, and storage tanks must maintain a vacuum level;

7. Ensure good ventilation in the area where the equipment is located;

8. Ensure the system is depressurized before maintenance or repair;

9. Keep away from flammable materials and electrical sparks;

10. Electrical and instrumentation components must not be exposed to water;

11. All electrical equipment must meet the explosion-proof requirements for hazardous areas;

12. Open flames or any unauthorized electrical and communication equipment, such as mobile phones and radio transmitters, are prohibited in areas with LNG.

 

Precautions:

LNG Pressurization

Direct pressurization is achieved using an LNG cryogenic high-pressure plunger pump.

The cryogenic high-pressure plunger pump requires pre-cooling before startup.

 

Pre-cooling

Open the pump inlet valve and return gas valve. LNG liquid flows into the pump head and fills it. The gas generated during pre-cooling returns to the storage tank through the return gas pipeline. A temperature detection device is installed on the pump return gas pipeline. When the temperature at the return gas inlet is detected to be below -100℃, maintain this temperature for 5 minutes; then pre-cooling is considered complete.

 

Pump Startup

Open the pump outlet vent valve to release the pump outlet pressure. Start the pump. After the pump starts running, close the outlet vent valve. This can be done automatically by the PLC system. Listen to the pump's operating sound to see if it is running normally and whether it is running dry. The sound of dry running is completely different from normal operation. If dry running occurs, open the pump gas phase vent valve appropriately to release the gas. If the pump runs normally after venting, close the vent valve. If the pump still does not run normally after 15 seconds of venting, stop the pump immediately and then re-pre-cool.

 

Caution

No single ambient air vaporizer should operate continuously at full load for more than 8 hours. After 8 hours, it should be switched to another vaporizer. Vaporizers not in use can defrost naturally. (The PLC system can automatically switch between them.)

In areas with low ambient temperatures, a water bath heater will be installed after the ambient air vaporizer to reheat the gas output from the vaporizer when the ambient temperature is low, ensuring that the gas temperature entering the storage well is ≥-5℃. The PLC system will automatically determine whether to activate the water bath heater based on the outlet temperature.

 

LNG Storage Tank Pressurization

When the LNG storage tank pressure is too low (≤0.2MPa), the LNG storage tank should be pressurized.