Your Professional LNG Fueling Station Supplier
Since its founding on March 24, 2010, Tianjin Baiyan Technology Co., Ltd. (“Baiyan”) has aligned itself with China’s national clean-energy strategy. The company is dedicated to the research & development, manufacturing, installation, and maintenance of vehicle and marine energy equipment — including LNG, CNG, and hydrogen fueling and storage systems. Baiyan has provided one-stop total-solution services to over a thousand clients across more than 20 provinces in China, forging long-term partnerships with many major players in the clean-energy sector.

Certifications
With ISO 9001 certification ensure product quality control and provide reliable guarantees.
Sales Market
To provide global customers with safe, efficient, and reliable energy refueling and storage systems - accelerating the adoption of clean energy transportation and green maritime operations worldwide.
After-sales Service
Baiyan Technology's technical services cover full coverage from website construction consulting, site selection, graphic design, equipment supply, installation, commissioning, use training, to technical services and after-sales service, and are not limited to the gas stations built by Baiyan Technology, and for other gas stations, Baiyan Technology can also provide technical services.
Technical Specifications for LNG Fueling Stations
LNG fueling stations are designed to meet the highest standards of efficiency and safety, providing a robust solution for the growing demand for liquefied natural gas. Below is a comprehensive overview of key technical specifications that define the performance of our LNG fueling stations:
|
Parameter |
Specification / Standard |
Description |
|
Working Pressure Range |
0.1 – 1.6 MPa |
Safe operating pressure range for LNG dispensing systems. |
|
Refueling Capacity |
Up to 120 L/min per nozzle |
High-speed refueling to minimize vehicle downtime. |
|
Storage Capacity |
20 m³, 30 m³, 60 m³ (customizable) |
Multiple tank volume options to suit different site requirements. |
|
Operating Temperature |
≤ −162°C (cryogenic) |
Designed for cryogenic conditions; all components rated for LNG service. |
|
Metering Accuracy |
±0.5% |
Precision fuel dispensing in compliance with industry standards. |
|
Power Supply Requirements |
380V, 50Hz |
Standard electrical supply for industrial installation. |
|
Explosion Protection Rating |
Ex d IIB T4 |
Certified for safe operation in hazardous (Zone 1/Zone 2) environments. |
|
Control System Type |
PLC-Based Automation |
Fully automated control for optimal performance, monitoring, and safety management. |
The top of the filling station is equipped with a 20ft/40ft tank for storing LNG, and the bottom is equipped with a 20ft/40ft skid-mounted pump skid for LNG filling, which is convenient for on-site installation and debugging, and easy to be moved;
The overall skid-mounted integration, pre-commissioning before leaving the factory, improves the reliability and stability of the product;
Compact design, small footprint, saving land resources;
According to the needs of use, the 20ft gas station can be equipped with one pump and one gun or one pump with two guns, and the 40ft gas station can be equipped with two pumps and four guns;
Combined with the self-developed IC card system and remote transmission system, IC card sales, remote monitoring of operation status and safety monitoring are realized;
It has the functions of refilling measurement, return gas measurement, LNG unloading measurement, tank self-pressurization, and saturation adjustment;
Configurable PLC control system, with one-key operation function, easy to learn, highly intelligent and easy to operate.

LNG Fueling Station Process Flowchart
Unloading Process: Transfer LNG(liquid natural gas) from the tank truck to the LNG storage tank of the gas station through the LNG submersible pump skid(including the unloading truck and the tank booster) at the gas filling station.
Pressurization Process: After unloading, the LNG is pressurized to above 23Mpa by the LNG high pressure pump skid, and then gasified into CNG(high pressure natural gas)by the high pressure vaporizer skid(including high pressure vaporizer, high pressure water bath electric heating reheater, and sequence control panel), and enter the high pressure gas cylinder group for storage.
Gas Filling Process: When the pressure in the high pressure gas cylinder group is too low to be able to refill normally, the high pressure pump restarts and vaporizes to replenish and pressurize the high pressure gas cylinder group, and refill the car.
Liquid Filling Process: LNG is pressurized to about 1.6Mpa by the LNG submersible pump skid, and LNG is filled into the car bottle group through the pipeline and LNG dispenser.
LNG filling station component
OFFLOAD PUMP SKID
Used to pump the LNG out of the trailer at 18m3/h; offload time is between 1.5 to 2 hours.
WLNG STORAGE TANK
Cryogenic storage tank for LNG, Above ground storage with a recommended volume; other capacities available.
FAST-FUEL LNG DISPENSER
Single hose 1or 2 dispenser with flow rates
TIME-FILL POST
A hose at a parking stall connected to a common supply.
PROCESS SKID
Used for dispensing and saturation operations.
PLC control system
Complete PLC control system supporting remote access
Certificate




FAQ
With abundant experience, we are one of the most professional lng fueling station manufacturers and suppliers in China. We warmly welcome you to buy customized lng fueling station made in China here from our factory. If you have any enquiry about pricelist and quotation, please feel free to email us.
Electrical Cabinet, cng lng, lng station

















