LNG Refueling Station Operating Procedures

1. After the LNG tanker truck enters the station, guide and supervise it to park in the designated unloading position, connect the grounding wire, and place anti-slip wooden blocks.

 

2. Check the temperature of the liquid in the tanker truck and the liquid in the storage tank to determine the unloading plan. If the liquid temperature in the storage tank is higher than that in the tanker truck, top filling is recommended; otherwise, bottom filling is recommended.

 

3. Check the integrity of the LNG liquid and gas phase unloading hoses.

 

4. Check the pressure and liquid level in the storage tanks within the tank area.

 

5. Check the opening and closing positions of all valves from the unloading platform to the storage tank according to the LNG filling procedure to ensure they are in normal working order.

 

6. After confirming that all the above points are accurate, the station operator checks and records the tanker truck's pressure, temperature, and liquid level.

 

7. The operation from the unloading area to the tank area is performed by the station operator, and the operation from the tanker truck to the unloading platform is performed by the tanker truck escort. During the filling process, conduct regular inspections of all process valves, pipelines, and instrument conditions, record the results, and take precautions to avoid potential hazards.

 

8. Specific Unloading Operations

  • Pressure the tank truck to the storage tank pressure plus 0.2 MPa, with the tank truck pressure not exceeding 0.66 MPa.
  • After confirming the tank truck pressure reaches the specified level, correctly open the inlet valve.
  • Observe the inlet pipe. If frost forms and there is a flowing sound, unloading is normal. If there are leaks at joints, immediately stop unloading and eliminate the hazard.
  • Observe the pressure and liquid level changes in the tank truck and storage tank. Maintain a pressure difference of approximately 0.2 MPa through depressurization of the storage tank and pressurization of the tank truck, with the tank truck pressure not exceeding 0.66 MPa.
  • After the liquefied natural gas is unloaded, close the liquid phase pipe inlet valve and the storage tank inlet shut-off valve.